0208 150 3330
Clever Signs — Signage, Printing, Branding
Colourful construction hoarding graphics alongside a pavement

Perimeter to entrance · East London site programmes

Construction Hoardings
& Site Signage.

Make the site work harder. Durable perimeter graphics, clear entrance identities and safety information planned around the realities of a live construction programme.

ACM Hoarding PanelsAnti-Graffiti OptionsEntrance MonolithsSafety BoardsMesh Fence Scrim

Purpose-built signage

A working perimeter. A visible project.

Connect your development identity with practical site communication. Plan panel joints, gateway visibility and staged updates so the hoarding tells the story while the site changes behind it.

Survey before specification

Dimensions, surfaces, access and real-world viewing conditions.

Approval before production

Materials, artwork, programme and the agreed project responsibilities.

Systems & material guide

Choose the right starting point.

Visual reference for acm hoarding panels

01 / 05

ACM hoarding panels

Rigid printed panels create a continuous development campaign. Set out artwork across the surveyed perimeter, allowing for joints, gates, levels and return corners.

Material starting point

Specified aluminium composite panels with exterior print finish

Resolve before manufacture

Support structure, panel grade, fire requirements and fixing centres

Include this in your project brief

Materials. Scale. Real-world impact.

See the possibilities.

Project coordination

Built around a live site.

5min from the ExCel London, the studio is well placed for local site enquiries. Fast-turnaround requests are reviewed against panel quantities, artwork readiness, materials and safe site access — not promised before the brief is checked.

Start the project conversation

Phased programmes

Break the perimeter into production and installation zones, allowing for changing access and staged handovers.

Site safety & CSCS

Confirm installer CSCS card requirements and supporting accreditation evidence with the studio before appointment; accreditation has not been verified here.

RAMS & inductions

Agree task-specific risk assessments, method statements, permits, inductions and principal-contractor requirements.

Logistics & revisions

Record unloading access, storage, panel numbering and replacement artwork so campaign updates remain manageable.

01 · Site & programme

02 · Samples & approvals

03 · Production & logistics

04 · Install & handover

Technical & specification considerations

The detail behind the impact.

Wind-load review

Wind-load compliance needs a site-specific assessment of exposure, dimensions, supports, foundations and fixings. Request suitable design calculations before manufacture.

Hoarding structure

Graphics are not a substitute for a structurally sound perimeter. Confirm ownership and approval of the support structure with the responsible contractor.

Safety information

Safety-sign content must reflect the site risk assessment. Confirm the exact ISO 7010 symbols and required notices with the site safety lead.

Inspection & cleaning

Agree checks after severe weather and a cleaning regime compatible with the print and laminate. Plan access for replacement panels.

Final performance, approvals and compliance must be supported by the agreed design, supplier documentation and site-specific review.

Printed campaign banner attached to roadside fencing

Details in context

Brand the boundary. Plan the load.

Fence graphics need a considered attachment strategy. Match the material and fixing approach to the actual structure and exposure.

Discuss your specification

Before we begin

Good questions.
Better projects.

0208 150 3330

Still have a question?

Talk it through with the studio.

A quick call often answers more than a page of FAQs — share your space, timings and brand assets.

Call 0208 150 3330info@cleversigns.co.uk
01How quickly can you produce site graphics in East London?

Send quantities, sizes, approved artwork and your deadline. The studio will assess capacity, material availability and access before confirming a turnaround.

02Are your installers CSCS accredited?

CSCS requirements and installer evidence must be confirmed for the proposed team before booking. This page does not present an unverified accreditation claim.

03Does mesh eliminate wind-load concerns?

No. Mesh can reduce wind resistance, but the complete fence or support system still needs a suitable site-specific load assessment.

04Can hoarding artwork change as the development progresses?

Yes, plan numbered panels and replaceable zones in the initial specification. Availability and the update schedule are agreed with the studio.

Project specification builder

A clear brief.
A stronger start.

Three quick steps. Build a starting specification for a site survey and a tailored estimate.

Single-site project

Survey & installation planning

Cost depends on materials, fabrication, quantity and safe access. A monetary estimate needs studio review.

Book a site survey · 0208 150 3330

Appointment times are confirmed by the studio.